Department of Elementary and Secondary Education Logo
The Department has moved to 135 Santilli Highway in Everett. The Department's office and Licensure Welcome Center are open. The new location has free parking and is a short walk from the Wellington station on the MBTA's Orange Line.

Grants

FY13 Title I, Title II-A and Race to the Top Final Report Information

All FY2013 Title I, Title II-A and Race to the Top grants processed through Grantium (formerly G3) should use this FY2013 Final Report form (FR-1) Download MS EXCEL file. All Race to The Top (RTTT) grants had an end date of 6/30/13. The final expenditure report FR-1, is normally due 60 days from the grant end date. As a result of the ongoing technical issues with the Grantium system, submission date of the FR-1 for this year had been extended to 9/30/13. Please fill out and return the signed form to us via post office mail (no emails please!) to the address on the form. Title I and Title II only:
If you extended your grant into Year 2 by filling out and returning the multi-year delegation form back in May, then you do not need to complete a final report at this time. Your FY13 grant was extended until 6/30/2014. An FR-1 will be due as of 8/31/2014. If you did not extend your grant through the multi-year format, and have claimed and fully expended all of your FY13 funding, please use the attached RF-1 form and return it completed and signed as directed by 9/30/13. Although you did not file for the multi-year as requested, we have extended all end dates out to 6/30/14 as a precaution for anyone who has claimed, but now finds that they have not fully expended all FY13 funds. Past practice would have required you to file an FR-1 and return the unexpended amount, the extension will allow you to continue to expend the funds as soon as possible for any appropriate grant activities. The FR-1 can be filed once all the funds have been expended and all expenditures have been reconciled. If you did not extend your grant through the multi-year format, and did not draw down the full amount of your FY13 grant award, Grants Management has created a year 2 encumbrance for you and have already extended the end date of the grant until 6/30/2014. The amount left undrawn will be made available for drawdown in late September. An FR-1 will then be due 8/31/2014 If you have any questions, please contact:
Susan Yee781-338-6509syee@doe.mass.edu
Susan O'Brien781-338-6572Sobrien@doe.mass.edu
Jennifer Ahern781-338-3215 Jahern@doe.mass.edu




Last Updated: December 10, 2013



 
Contact Us

Massachusetts Department of Elementary and Secondary Education
135 Santilli Highway, Everett, MA 02149

Voice: (781) 338-3000
TTY: (800) 439-2370

Directions

Disclaimer: A reference in this website to any specific commercial products, processes, or services, or the use of any trade, firm, or corporation name is for the information and convenience of the public and does not constitute endorsement or recommendation by the Massachusetts Department of Elementary and Secondary Education.